Overview

On this five-year IDIQ contract under the DOI, WAI performs Operations, Maintenance and Repair (OM&R) of the Paradox Valley Unit (PVU), a salinity control facility located on the Dolores River approximately one mile from Bedrock, Colorado. The facility’s salinity control for the Colorado River system prevents up to 180,000 tons of salt per year from entering the river by injecting the brine into a deep well formation. WAI provides 24/7 staffing to the facility during injection operations, and has consistently received Exceptional ratings in all performance evaluations on this contract.